Production sites

Cecomp Spa

LA LOGGIA (Turin) – Italy

Via Ronchi 8/16 – 10040

Covered surface area: 22.000 sqm.

La Loggia plant, located on three linked production units, has been the historical headquarters of Cecomp spa since 1978.

  • Centralised structures at CECOMP and Group level: commercial, research and development, production planning, purchasing, administration, finance and control, quality and environmental assurance, personnel and information systems.
  • Production Unit: production is carried out for design, showcar, style models and prototypes, tool and mould construction (prototype and production).
  • The plant has obtained IATF16949:2016 and ISO 9001:2015 certifications attesting to production quality standards as well as ISO 14001:2015 for environmental certification.
  • The production site specialises in both the design and manufacture of models, one-offs, prototypes as well as C.N.C. machining, moulds and tooling.
ACTIVITIES
  • Process Engineering
  • Modelling
  • Tooling and mould construction
  • Assembly
  • Master cubing
PRODUCTS
  • Showcars and models
  • Prototypes
  • One off
  • Turn-key projects

Cecomp spa

MONCALIERI (Turin) – Italy

Via Vittime di Piazza Fontana 37/41– 10024

Covered surface area: 15.000 sqm.

In 2014, Cecomp Spa, following the acquisition of Model Master Spa (main competitor among the coachbuilders in the area) took over both the three production plants and further specific know-how on prototype processes.

  • Decentralised structures: logistics, quality control, production planning and area systems.
  • Specialised production site for prototype components and pre-series production.
  • Potential production capacity to support low-volume production.
  • The plant has obtained IATF16949:2016 and ISO 9001:2015 certifications attesting to production quality standards.
  • High size and tonnage presses supporting Piobesi’s production.
  • Robotic line consisting of 7 fully automated Yaskawa robots for body manufacturing.
ACTIVITIES
  • Sheet metal stamping
  • 2D and 3D laser cutting
  • Prototype parts production (panelling)
  • Structural parts production
  • Assembly
  • Laser welding
PRODUCTS
  • Printed Panels (large dimensions)
  • Prototypes
  • Subassemblies and complete bodies

Cecomp spa

PIOBESI T.se (Turin) – Italy

Via della Masolina 8 – 10040

Covered surface area: 12.000 sqm.

The Piobesi plant, acquired and completely renovated in 2016, was named after Giovanni Forneris, founder of Cecomp in 1978. It incorporates a high level of technology and innovation according to the canons of «Industry 4.0».

  • Decentralised structures: logistics, quality control, production planning and area systems.
  • Production site concentrating all processes for low-volume production of complex aluminium components
  • Automated stapling, welding and milling lines for stamped and extruded aluminium components.
  • The plant has obtained IATF16949:2016 and ISO 9001:2015 certifications attesting to production quality standards as well as ISO 14001:2015 environmental certification.
ACTIVITIES
  • Moulding
  • 2D laser cutting
  • 3D laser cutting
  • Extruded profile milling
  • Assembly
  • Measuring
PRODUCTS
  • Printed Panels (large dimensions)
  • BIW components
  • Chassis
  • Stapled moving parts

Cecomp Doo

Mirna Pec (Novo Mesto) - Slovenia

Covered surface area: 19.000 sqm.

Cecomp Doo, located in Mirna Peč in Slovenia, was established and inaugurated in 2013 to initially respond to the needs of the Renault Group for the series production of certain vehicles such as the Twingo and the electric Smart EV.

  • Headquarters structures: management, production planning and scheduling, purchasing, administration and control, personnel, quality control and area systems.
  • The production unit specialises in high-volume series production of stamped and assembled parts.
  • It is currently the largest component moulding plant in Slovenia.
  • The plant is IATF 16949:2016 certified, attesting to its production quality standards.
ACTIVITIES
  • Cutting-to-length
  • Progressive stamping
  • Transfer moulding
  • Robotic assembly
PRODUCTS
  • Components, chassis and BIW
  • Subassembly assembly

Seltap spa

MONCALIERI (Turin) – Italy

Via Vittime del Vajont 3/1 – 10024

Covered surface area: 2.000 sqm.

Seltap was established in 2008 and consists of two divisions: upholstery and additive manufacturing.

  • Headquarters structures: management, production planning, purchasing and logistics.
  • The upholstery division deals with the development of prototypes, limited series production, customisation and restoration for the automotive, nautical, aviation, classic car restoration and interior design sectors.
  • The additive manufacturing division (added from May 2020): deals with design, prototype development as well as additive manufacturing using the most modern and innovative 3D printing technologies available.
  • The plant has obtained ISO 9001:2015 certification.
ACTIVITIES
Upholstery Division
  • Prototypes
  • Interior Design
  • 3D laser cutting
  • Production
  • Customisation
ACTIVITIES
Additive Manufacturing Division
  • 3D Printing
  • Finishing
  • Painting
  • Vacuum Casting
PRODUCTS
  • Interiors
  • Upholstery

Subsidiaries

Icona was founded in Italy in 2010 to combine design, engineering, modelling, and prototyping skills in order to develop style models, show cars and prototypes. Today it has offices in Turin, Shanghai and Los Angeles.

Microlino Italia Srl is the company set up at the end of 2020 for the production and distribution of the new all-electric car model called “Microlino”. It is based in La Loggia in two production plants, adjacent to the Cecomp spa plant.

In the main plant (about 5,000 sqm) are the centralised structures (management, production planning, purchasing and logistics) as well as the production lines (assembly, finishing, painting); in a second, detached plant (about 3,500 sqm) is the functional area dedicated to quality control of the finished cars and the storage of the cars ready for shipment to end customers.